This is to certify that M/s Thermosonics P.vt Ltd. have successfully Design, Manufactured and Installed Acoustic Operator Cabin at Taloja Plant as per our purchase order TL/CAP/S/1819/2453, dated 29/10/2018.
The installation work was completed in 3 days i.e. from 11/02/2019 to 13/02/2019.
Copyrights © 2023 All Rights Reserved. Powered By: RANK MY BUSINESS
Copyrights © 2023 All Rights Reserved. Powered By: RANK MY BUSINESS